St. Rafał Kalinowski's road tunnel

St. Rafał Kalinowski's road tunnel project

Location

Kraków

Scope of work
Laser scanning, spherical panoramic pictures, TruView, 2D documentation

Project purpose
Verification of the geometry correctness of both ways inlongitudinal and cross planes as well as discrepancies of the resistance walls outside the tunnel

Deliverables
Point cloud in PTS format, web portal with TruView and high resolution panoramic pictures, 2D documentation


St. Rafał Kalinowski's road tunnel located under the Main Railway Station and Krakowska Gallery shopping centre was an object of scanning.

The tunnel had been in use since 15th May 2007 and is a part of the investment called Krakow Communication Centre. The tunnel is 230 m long and has two roadways in both directions; it was built by Budimex Dromex S.A and Ferrovial Agroman S.A. Consortium. The measurements carried out by Capnor Poland were to verify if the geometry correctness of both ways inlongitudinal and cross planes as well as discrepancies of the resistance walls from the vertical.

Professional Engineering Services

At Capnor, we deliver engineering services that set new standards for quality and efficiency. From precise laser scanning to advanced drone photography, our innovative approach revolutionizes how you make decisions and execute projects. Trust us and focus on your goals. We will handle the rest.